What preventative maintenance is required for Fuji Electric UPSs?

Fuji Electric recommends two PMs per year, one “minor” PM to check batteries, and inspect the unit online, and one “major” PM to send the load to bypass, do a thorough mechanical inspection and cleaning, full diagnostic test, and of course inspect the batteries as well.

Was this answer helpful ? Yes / No

Top of Page